Quantity Surveyor
Id Job: 316a304
Id Job: 316a304
Quantity Surveyor
Location: Greenwich
The Project
The Silvertown Tunnel project was awarded to the consortium Riverlinx CJV (Ferrovial Construction, BAM and SK) at the end of May 2019. This complex 5-year project will construct a twin-bore road tunnel under the Thames in east London which will link Silvertown to the Greenwich Peninsula. The Silvertown Tunnel aims to prepare for London’s future population growth and relieve the congestion and poor air quality around the 122-year-old Blackwall tunnel. It is the UK’s first road tunnel to have dedicated bus lanes, buses are all expected to be zero emission vehicles and will support the increasing demand for bus transport across Greenwich, Newham and Tower Hamlets.
The Silvertown Tunnel (STT) Project involves the construction of a twin-bore road tunnel with a Tunnel Boring Machine (TBM), providing a new connection between the A102 Blackwall Tunnel Approach on Greenwich Peninsula and the Tidal Basin Roundabout junction on the A1020 Lower Lea Crossing/ Silvertown Way.
Key Responsibilities
Key skills and experience
Please note that this job description does not represent a comprehensive list of activities and employees may be requested to undertake other reasonable duties.
Ferrovial embraces diversity and inclusion, and we see the value in providing equal opportunities to all employees. We are committed to building an inclusive team from a variety of different backgrounds, perspectives and skills.
Job Types: Full-time, Permanent
Work Location: One location